ADD ANYTHING HERE OR JUST REMOVE IT…
seecon Ingenieure GmbH
  • Home
  • About Us
    • Philosophy
    • History
    • Management
    • Group
  • expertise
    • Nature
    • Energy and Climate
    • City and Space
    • Urban Water Management and Transport
  • Locations
  • projects
  • Blogs
  • Career
    • Job Offers
    • Vision & Mission
    • Employee Benefits
    • Goodwill
    • Leadership Development Program
  • Log in
en_GB EN
en_GB EN de_DE DE
seecon Ingenieure GmbH seecon Ingenieure GmbH
en_GB EN
en_GB EN de_DE DE
Menu
HomeFloor Versmannkai Ost, building site clearing BF 102-110
Previous product
Orientierende Untersuchung (Phase IIa) der Standortschießanlage Bad Arolsen, Bad Arolsen
Preliminary investigation (phase IIa) of the Bad Arolsen shooting range, Bad Arolsen
Back to products
Next product
Deponie Kanonenberg
Landfill Kanonenberg

Versmannkai Ost, building site clearing BF 102-110

Compare
Add to wishlist
  • Description
Description
Project volume: EUR 2.5 million; total project
Order volume: EUR 53,000; own contribution
Period: 2016 - 2018
Field of activity: Explosive ordnance clearance
Scope of services: Consultancy services, planning services, tendering, participation in award of contract, construction supervision
Short description: Versmannkai Ost is located in the Elbbrücken quarter of HafenCity. This is currently being developed into a new district with residential and commercial development.

The construction sites 102, 105, 108 and 110 were located in a former water area that had not yet been explored. The aim of the work was to check the unexplored construction sites with suspected unexploded bombs down to a depth of -9.5 m below sea level (-15 m below ground level) by means of borehole probing and to achieve clearance.

In the run-up to the exploratory work, existing quay installations (quay slab, concrete spar, sheet pile wall) had to be demolished in some areas. The sheet pile wall was only partially removed. The soundings were carried out by means of a triaxial magnetometer, supplemented by an active method (here 4R-EM) and borehole georadar in order to determine the

The aim was to keep civil engineering costs for the recovery as low as possible. The recovery at greater depths was carried out by means of large-hole drilling and diving operations.

The terrain was adjusted by backfilling the excavation pits and modelling to contractually agreed transfer heights.

Ähnliche Projekte

Compare
Quick view
Add to wishlist
Close

Preliminary investigation (phase IIa) of the Bad Arolsen shooting range, Bad Arolsen

Floor
Compare
Quick view
Add to wishlist
Close

Additional detailed investigation of the risk of contaminated sites on the Hastedter Osterdeich property in Bremen

Floor
Compare
Quick view
Add to wishlist
Close

Expansion of the Kiel Canal, test field exploration of explosive ordnance

Floor

business areas

Nature
City and Space
Energy and Climate
Urban Water Management and Transport

group members

M&P Group
M&P engineering company
TABERG engineers
M&P Project
Prof. Burmeier Engineering Society
T&P Consulting Engineers
M&P Water


Durselen real estate

M&P Climate
M&P environmental technology 
M&P Energy 
ICP Engineering Company Prof. Czurda and Partners Ltd

Contact

seecon engineers GmbH
Spinnereistrasse 7
Hall 14 (staircase B)
04179 Leipzig
Germany
phone: +49 (0) 341 484 051 1
fax: +49 (0) 341 484 052 0
e-mail: info@seecon.de

Imprint | Data protection
  • Home
  • About Us
    • Philosophy
    • History
    • Management
    • Group
  • expertise
    • Nature
    • Energy and Climate
    • City and Space
    • Urban Water Management and Transport
  • Locations
  • projects
  • Blogs
  • Career
    • Job Offers
    • Vision & Mission
    • Employee Benefits
    • Goodwill
    • Leadership Development Program
  • Log in