ADD ANYTHING HERE OR JUST REMOVE IT…
Versmannkai Ost, building site clearing BF 102-110

Project description

Period:2016 - 2018
Field of activity:Explosive ordnance clearance
Scope of services:Consultancy services, planning services, tendering, participation in award of contract, construction supervision
Short description:Versmannkai Ost is located in the Elbbrücken neighbourhood of HafenCity. The construction sites 102, 105, 108 and 110 were located in an as yet uninvestigated area of a former waterfront. The aim of the work was to check the as yet unprobed construction sites with suspected unexploded bombs down to a depth of -9.5 m above sea level (-15 m below ground level) by means of borehole probing and to achieve clearance.in the run-up to the probing work, existing quay installations (quay plate, concrete beam, sheet piling) were to be demolished in some areas. The sheet piling was only partially removed. The soundings were carried out using a three-axis magnetometer, supplemented by an active method (in this case 4R-EM) and borehole georadar in order to minimise the civil engineering work required for the salvage. Salvage at greater depths was carried out using large borehole drilling and divers, and the terrain was adjusted by filling in the excavation pits and modelling to contractually agreed transfer heights.

SIMILAR PROJECTS

Area justice and sustainable mobility in Leipzig (#FNMLeipzig) - Action in the framework of the European Mobility Week (EMW) 2021
Tree cadastre for the Parkstadt Dösen
System Thinking at a departmental retreat of the City of Leipzig on the topic of recruiting and retaining skilled workers